Power

13.5 MW

Colocation Space

43.1K sqft

Overview

Australia's first purpose-built data centre for AI Factories and sovereign AI. Designed for GPU-intensive workloads with advanced high-density and liquid-cooling capabilities. Adjacent to S3 Sydney campus.

Key Points

  • 13.5MW target IT capacity
  • 4,000m2 technical space
  • Located in Artarmon
  • Purpose-built for AI Factories and sovereign AI
  • Designed for GPU-intensive workloads
  • Advanced high-density and liquid-cooling capabilities
  • Progress-to-certification for Uptime Institute Tier IV
  • Adjacent to S3 Sydney campus
  • Mission critical office space available

Certifications

Uptime Institute Tier IV (progress-to-certification)