Power
13.5 MW
Colocation Space
43.1K sqft
Overview
Australia's first purpose-built data centre for AI Factories and sovereign AI. Designed for GPU-intensive workloads with advanced high-density and liquid-cooling capabilities. Adjacent to S3 Sydney campus.
Key Points
- •13.5MW target IT capacity
- •4,000m2 technical space
- •Located in Artarmon
- •Purpose-built for AI Factories and sovereign AI
- •Designed for GPU-intensive workloads
- •Advanced high-density and liquid-cooling capabilities
- •Progress-to-certification for Uptime Institute Tier IV
- •Adjacent to S3 Sydney campus
- •Mission critical office space available
Certifications
Uptime Institute Tier IV (progress-to-certification)
Apr 2026
Sources: