Colocation Space
80.1K sqft
Power Density
4 kW/rack
Overview
Adjacent to SY5, part of Alexandria campus. Phase Two doubled capacity to 3,000 cabinets.
Key Points
- •Opened August 2016, enterprise-focused
- •3,000 cabinets at full build-out
- •200 Bourke Road with SY5
- •Direct cross connect to SY1/SY2/SY3
Cloud On-Ramps
AWSMicrosoft AzureGoogle ComputeOracle Cloud
Internet Exchanges
Equinix Internet Exchange
Certifications
ISO 27001PCI DSSSOC 1 Type IISOC 2 Type IIISO 9001ISO 22301ISO 14001LEED Certified (Silver)
Infrastructure
UPS Redundancy
Block Redundant
Generator Capacity
24.0K kW
Uptime SLA
>99.9999%
Renewable Energy
19%
Security
Perimeter fence and gateMan trap24/7 on-site security personnelBiometric readersSpeedstiles with biometric 2-factor authenticationCCTV surveillance with 30-day retentionMotion detection
Amenities
Break RoomLoaner ToolsShowersCrash CartsWork KiosksWifiConference Room
Spec Sheet (PDF)
Mar 2026