Power
5 MW
Colocation Space
31.5K sqft
Overview
South Australia's first Uptime Institute Tier IV-certified data centre. Uses static (battery) UPS supported by MTU (Rolls Royce) engines. 48 hours fuel storage on-site. 24 hours water storage. Target PUE of 1.25 yearly average or 1.15-1.2 yearly lowest.
Key Points
- •5MW IT load target capacity
- •6MW total capacity
- •1,470 rack capacity
- •2,922m2 technical space
- •Located in Adelaide CBD
- •First major metropolitan DC using static UPS with MTU engines
- •100% UPS backup of entire site including mechanical systems
- •Hot aisle containment with ceiling plenum hot return
- •Direct and indirect free air-cooling economisation
- •ASIO Physical security ZONE 4 capable
- •Two factor biometric fingerprint security
Certifications
ISO 9001ISO 14001ISO 45001ISO 27001SOC 1 Type IISOC 2 Type IIPCI DSSDTA Certified Strategic hosting providerTier IV Uptime Institute standard (Design, Build and Gold Operations)Climate Active Carbon Neutral Standard
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Apr 2026