DCQ
EquinixOperationalAI-Ready

Equinix PE3

37 Lemnos Street, Shenton Park, Perth, Western Australia
Equinix
Liquid Cooling
Colocation Space

19.7K sqft

Power Density

4.3 kW/rack

Building Size

114.1K sqft

Overview

AI-ready with liquid cooling support. $54M investment. Direct connection to ASC and Indigo subsea cables.

Key Points

  • Opened December 2021, $54M investment
  • AI-ready with liquid cooling support
  • 1,650 cabinets, 10,600 sqm at full build
  • Link bridge to PE2, subsea cable access

Internet Exchanges

Equinix Internet Exchange

Certifications

ISO 27001PCI DSSSOC 1 Type IISOC 2 Type IIISO 9001ISO 22301ISO 14001ISO 50001

Infrastructure

UPS Redundancy

N+1

Cooling Redundancy

N+1

Uptime SLA

>99.9999%

Renewable Energy

19%

Security

24/7 on-site security personnelbiometric scannerproximity card access control24/7 security camera recordingdigital archivingdual authentication access

Amenities

BreakroomConference Room(s)Crash CartsLoaner toolsWifiWork Kiosks