Power
20 MW
Colocation Space
129.2K sqft
Overview
Only facility in WA holding both Tier IV design and constructed certifications
Key Points
- •12,000m2 technical space
- •6,300 rack capacity
- •Located in Perth CBD
- •Gateway to major submarine cable systems
- •Hot aisle containment with cold flooded room
- •24 hours fuel storage on-site per generator
- •Peak design 4000w/m2 heat load capacity
- •Two-factor biometric fingerprint security
- •Designed with ASIO T4 accredited consultant advice
- •Data Hall perimeters meet SCEC Zone 3 intent
Certifications
Tier IV design certifiedTier IV constructed certified
Infrastructure
UPS Redundancy
1.5MW Piller rotary UPS
Cooling Redundancy
N+1 cooling circuits, N+2 CRAC units per data hall
Apr 2026
Sources: