DCQ
IRENOperationalAI-Ready

IREN Mackenzie

Mackenzie, Canada
IREN
Power

80 MW

Overview

80MW BC Hydro-powered facility. Converting from Bitcoin mining to AI/GPU. 40,000 GPUs across BC by end 2026. PUE 1.1.

Key Points

  • 80MW capacity, BC Hydro powered
  • Converting from Bitcoin to AI infrastructure
  • 40,000 GPUs planned across BC by 2026
  • Industry-leading PUE of 1.1
VerifiedSource: IREN
Mar 2026