Power
148 MW
Overview
CloudHQ's Paris campus with two 74.4MW buildings. First building operational June 2025. Waste heat warms 7,000 homes.
Key Points
- •148MW total (2x 74.4MW buildings)
- •225kV on-site substation, 114 backup generators
- •CDG1 operational June 2025
- •53,000 sqm with 24 data halls per building
- •Waste heat connected to district heating for 7,000 homes