Paris 1

Paris, France
NTT Global Data Centers
Power

84 MW

Overview

Paris 1 Data Center will be available at the end of 2027 and is located in the Le Coudray-Montceaux and Corbeil-Essonnes regions, 50km south of Paris.

Key Points

  • Three planned, free-standing buildings with total capacity of 84MW of critical IT load once fully built out
  • Located in the Le Coudray-Montceaux and Corbeil-Essonnes regions, 50km south of Paris
  • The first building will provide 36MW of critical IT load
  • Will be available at the end of 2027
  • Features continuous mechanical cooling with N+1 redundancy and 24x7 on-site security presence

Infrastructure

Cooling Redundancy

N+1 redundancy

Security

24/7 security