Power
42 MW
Overview
Yondr's first Berlin campus in Ragow/Mittenwalde, 42MW full buildout. Phase 1 delivered 10MW in 2024. Key connectivity hub to Eastern Europe.
Key Points
- •42MW full campus capacity, Phase 1 delivered 10MW
- •Located in Ragow, Mittenwalde (Brandenburg) - south of Berlin
- •Strategic connectivity to Dresden, Leipzig, and Eastern Europe
- •Carriers: Colt, EXA Infrastructure, Arelion, euNetworks, Zayo
- •Part of Yondr's 82MW total German portfolio (includes Frankfurt 40MW)
- •Acquired by DigitalBridge and La Caisse in July 2025
Spec Sheet (PDF)
Mar 2026