Colocation Space
51.7K sqft
Power Density
5 kW/rack
Overview
Second facility in Equinix's Lärchenstrasse campus, opened 2021. Covered by 100% renewable energy.
Key Points
- •Part of three-facility Lärchenstrasse campus (FR6, FR8, FR13)
- •Opened 2021, 100% renewable energy covered
- •N+1 power and cooling redundancy
- •Secure, resilient colocation with metro connectivity to all Frankfurt IBXs
Internet Exchanges
DE-CIX FrankfurtEquinix Internet Exchange
Certifications
Climate Neutral Data Centre PactCyber EssentialsISO 14001ISO 22301ISO 27001ISO 45001ISO 50001ISO 9001PCI DSSSOC 1 Type IISOC 2 Type IITISAXTSI / EN50600
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Generator Capacity
3.0K kW
Uptime SLA
>99.999%
Renewable Energy
100%
Security
man trap24/7 security officerscard readersfiber vaultsbiometric readersCCTV surveillance
Amenities
BreakroomCrash CartsLoaner toolsWifiWork KiosksConference Room
Spec Sheet (PDF)
Mar 2026