Overview
NTT operates two Berlin data centers with combined power capacity of 41.1 MW and plans a third campus in Brieselang with 96 MW starting construction in 2025.
Key Points
- •Berlin 1 facility at Nonnendammallee 15 provides 17.1 MW power capacity and 11,700+ m² server space
- •Berlin 2 facility at Lankwitzer Strasse 45-47 delivers 24 MW across buildings A and B with 9,700+ m² space
- •Berlin 1 came online in 2021 while Berlin 2 became operational in 2022
- •Third Berlin campus planned in Brieselang with up to 96 MW across two data centers, construction starting 2025
Certifications
ISO 27001Tier III
Spec Sheet (PDF)
Mar 2026