Colocation Space
67.8K sqft
Overview
NTT Munich 2 opened in May 2017 with 6,300 m² of IT space across two buildings and targets a PUE of 1.2.
Key Points
- •Opened on May 18, 2017 with initial 2,800 m² capacity and 1,100 racks
- •Total 6,300 m² IT/server space across buildings A and B
- •14 MW critical IT load capacity with 30 MVA maximum power from two off-site substations
- •Located in Unterschleißheim near Munich with carrier-neutral connectivity up to 10 Gbps
- •Targets Power Usage Effectiveness (PUE) of 1.2
Certifications
SOC 2ISO 27001PCI DSS
Spec Sheet (PDF)
Mar 2026