Power
52.8 MW
Overview
The Noida 2 Data Center campus is spread over six acres and will support 52.8MW capacity across two buildings when fully built out.
Key Points
- •Campus will offer a total of 52.8MW of critical IT load capacity once fully built out
- •Spread over six acres with capacity across two buildings
- •Building A will support 22.4MW of critical IT load and building B will support 30.4MW
- •Buildings have seismic dampeners to protect the structure
- •Features 24x7 on-site security presence and a 7-level security system
Development Details
Land Size
6 acres
Infrastructure
UPS Redundancy
redundancy
Security
24x7 on-site security presence7-level security system