NeutraDC HDC Batam

Batam, Indonesia
NeutraDC
Power

50 MW

Overview

NeutraDC Nxera Batam hyperscale data center by Telkom Indonesia and Singtel's Nxera. 5 hectares with 51MW ultimate capacity. BTM-1 building topped out, launching H1 2026 with 18MW.

Key Points

  • Joint venture: Telkom Indonesia's NeutraDC and Singtel's Nxera
  • 5 hectare site at Kabil Industrial Estate (KIIE), Batam
  • Ultimate capacity: 51-54MW across three campus buildings
  • BTM-1 first building: 18MW, topped out, launching H1 2026
  • 90 MVA electricity agreement with PLN Batam (2025-2028)
  • Strategic location near Singapore, geographically safe from earthquakes

Development Details

Land Size

12.4 acres

Buildings (Planned)

3

Timeline

First Building:H1 2026
VerifiedSource: NeutraDC
Mar 2026