Power
50 MW
Overview
NeutraDC Nxera Batam hyperscale data center by Telkom Indonesia and Singtel's Nxera. 5 hectares with 51MW ultimate capacity. BTM-1 building topped out, launching H1 2026 with 18MW.
Key Points
- •Joint venture: Telkom Indonesia's NeutraDC and Singtel's Nxera
- •5 hectare site at Kabil Industrial Estate (KIIE), Batam
- •Ultimate capacity: 51-54MW across three campus buildings
- •BTM-1 first building: 18MW, topped out, launching H1 2026
- •90 MVA electricity agreement with PLN Batam (2025-2028)
- •Strategic location near Singapore, geographically safe from earthquakes
Development Details
Land Size
12.4 acres
Buildings (Planned)
3
Timeline
First Building:H1 2026