Power
54 MW
Colocation Space
246.0K sqft
Overview
CyrusOne's DUB1 facility is strategically located near Dublin, Ireland with potential to provide 54 MW of IT capacity across 22,854 sq. m. of technical space in three separate two-story buildings.
Key Points
- •22,854 sq. m. of technical IT space across three separate two-story buildings
- •54 MW total IT capacity potential
- •Active/Active dual redundant power supplies of 80 MVA
- •900 mm heavy-duty raised floor with 4,200 mm clear height
- •100% powered by renewable energy
Certifications
ISO 27001SOC 2
Infrastructure
UPS Redundancy
Active/Active dual redundant power supplies
Security
24x7x365 staffingmulti-layered securityadvanced access control systemscomprehensive video surveillancesecure managed delivery bay
Spec Sheet (PDF)
Mar 2026