DCQ
EquinixOperational

ML3

Via Francesco Sforza 13, Basiglio, Lombardy
Equinix
Power

3 MW

Colocation Space

25.6K sqft

Power Density

4 kW/rack

Overview

Milan area IBX at Basiglio. 100% renewable energy. Former Telecity site.

Key Points

  • 2,102 sqm (22,626 sqft) colocation at Basiglio
  • 100% renewable energy covered
  • N power, N+1 cooling redundancy

Internet Exchanges

Milan Internet Exchange (MIX)TOPIXEquinix Internet Exchange

Certifications

Climate Neutral Data Centre PactCyber EssentialsEU Code of ConductHDSISO 14001ISO 22301ISO 27001ISO 45001ISO 50001ISO 9001PCI DSSSOC 1 Type IISOC 2 Type II

Infrastructure

UPS Redundancy

N+1

Cooling Redundancy

N+1

Generator Capacity

9.4K kW

Uptime SLA

>99.999%

Renewable Energy

100%

Security

man trap entryproximity access card and PIN24/7 on-site security officersPIN and card readersbiometric readers optionalCCTV surveillance7-day video retentionmotion detection

Amenities

BreakroomCrash CartsLoaner toolsWifiConference Room(s)Showers
VerifiedSource: Equinix