Power
48 MW
Colocation Space
124.4K sqft
Overview
CyrusOne KEP OSK1 is a cutting-edge data center facility that spans a 19,693 sq. m. plot and will provide 11,562 sq. m. of technical space within a single building over four floors, featuring six 8 MW data halls.
Key Points
- •Facility spans a 19,693 sq. m. plot and will provide 11,562 sq. m. of technical space within a single building over four floors
- •Features six 8 MW data halls designed to deliver 48 MW of IT capacity
- •Supported by a 70 MVA utility power supply at 77KV from a new grid connection and a dedicated substation
- •The first phase will be operational by Q1 2028
- •Includes sustainability features such as Zero Waste to Landfill program, photovoltaic cells on roof for office areas, and onsite electric vehicle charging
Development Details
Total Space (Planned)
0.1M sqft
Timeline
First Building:Q1 2028
Security
24x7x365 staffingmulti-layered security
Spec Sheet (PDF)
Mar 2026