Colocation Space
88.0K sqft
Overview
100% renewable energy, modular cooling system with Dry Air Coolers and Aquifer Thermal Energy storage
Key Points
- •10 mins from Schiphol
- •Redundant power, cooling, and infrastructure
- •Supports high-density configurations
- •24x7 onsite security personnel
- •CCTV with 90 day backup
- •Biometric/Photo badge access
Certifications
SOC2PCI-DSSISO 27001ISO 22301SOC1ISO 50001
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Apr 2026
Sources: