DCQ
CyrusOneOperational

Amsterdam AMS1

Linieweg 1,1165 AA, Halfweg, Netherlands, Halfweg, Netherlands
CyrusOne
Power

54 MW

Colocation Space

316.0K sqft

Overview

This purpose-built campus in Halfweg provides 54 MW of IT capacity to 29,350 sq. m. of technical space within two buildings.

Key Points

  • 29,350 sq. m. of technical space across two buildings
  • 54 MW total IT capacity
  • 100% powered by renewable energy since 2021
  • Active/Active dual redundant power supplies of 60 MW
  • 900 mm heavy-duty raised floor with 3,600 mm clear height

Certifications

ISO 14001 Environmental Management

Security

24x7 securityCCTVbiometric
VerifiedSource: CyrusOne