Est. 2016
Power
42 MW
Colocation Space
484.4K sqft
Power Density
140 kW/rack
Overview
Only EU data center with both ANSI/TIA-942 Rated 4 and EN 50600 Class 4 certifications. Poland's first 100% renewable-powered data center.
Key Points
- •42MW campus capacity, 45,000 sqm, PUE 1.2
- •Dual certifications: ANSI/TIA-942 Rated 4 + EN 50600 Class 4 (only in EU)
- •100% renewable energy - first in Poland
- •140+ kW/rack AI-ready infrastructure
- •100% uptime since 2016, dual UPS systems (diesel rotary + battery)
- •4ms to Warsaw/Berlin, 10ms to Frankfurt
Certifications
ANSI/TIA-942 Rated 4EN 50600 Class 4
Mar 2026
Sources: