Power
2.5 MW
Overview
This EdgeConneX Warsaw data center has 2.5 MW N+1 power capacity and is located 7.5 km from Warsaw-Chopin International Airport and less than 1 km from the LIM-Building.
Key Points
- •Located 7.5 km from Warsaw-Chopin International Airport
- •Less than 1 km from Warsaw's 'colo hub' the LIM-Building
- •2.5 MW N+1 power capacity with N+1 configuration including PDU, UPS, and Generators
- •76 cm / 30 inch raised/under floor forced air plenum
- •Carrier neutral data center with multiple connectivity providers including Arelion, AT&T, Orange Poland, and others
Certifications
SOC 2 Type 2PCI-DSSISO 27001
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1