Digital RealtyOperational
ZUR2
Bäulerwisenstrasse 4, 8152 Glattbrugg, Switzerland, Zurich, Switzerland
Colocation Space
67.8K sqft
Overview
ZUR2 is described as Switzerland's largest and only carbon neutral data center with a total building size of 67,800 ft² and runs on 100% renewable energy.
Key Points
- •Total building size is 67,800 ft² (6,300 m²)
- •UPS redundancy is 2N and cooling redundancy is N+2
- •Uses 100% renewable energy
- •Has 24x7 onsite security personnel, CCTV, and biometric/photo badge access
- •Holds multiple certifications including SOC1, SOC2, ISO 27001, and FINMA RS-18/3
Certifications
SOC1SOC2PCI-DSSISO 14001ISO 27001ISO 50001ISO 22301FINMA RS-18/3SDEA Gold+
Infrastructure
UPS Redundancy
2N
Cooling Redundancy
N+2
Security
24x7 Onsite security personnelCCTVBiometric/ Photo badge access
Spec Sheet (PDF)
Mar 2026
Sources: