DCQ
SUPERNAP ThailandOperationalAI-Ready

SUPERNAP Thailand Chonburi

WHA Industrial Development, Chonburi, Chonburi, Thailand
SUPERNAP Thailand
Power

60 MW

Colocation Space

226.0K sqft

Overview

Thailand's only Tier IV colocation. 60MW capacity, 100% uptime since 2017. GPU-ready.

Key Points

  • Southeast Asia's only fault-tolerant Tier IV site
  • 60MW capacity, up to 5,000 cabinets
  • 100% uptime since 2017 opening
  • Up to 40kW per cabinet
  • 110m above sea level - outside flood zone
  • Solar panel farm on-site
VerifiedSource: SUPERNAP Thailand
Mar 2026