Colocation Space
1.5M sqft
Power Density
20 kW/rack
Overview
Two-building campus in Dagenham with redundant cooling system that operates without compressors or refrigerants, achieving a PUE of 1.2.
Key Points
- •64 MW total capacity across two buildings (32 MW each) with 12,800 m² of IT space
- •Features 10 data halls per building with bus-bar power distribution supporting up to 20 kW per cabinet
- •Operates with guaranteed renewable power and innovative cooling without compressors or refrigerants
- •Became operational in 2020 after construction planning began around 2018-2019
Certifications
ISO 27001Tier III
Infrastructure
UPS Redundancy
N+1