Phoenix PH4

10256 Elliot Rd., Bldg 4 Mesa, AZ 85212, Mesa, Arizona
NTT Global Data Centers
Liquid Cooling
Power

36 MW

Colocation Space

127.0K sqft

Power Density

70 kW/rack

Overview

Phoenix PH4 will be available in July 2026 and offers 36MW of critical IT load capacity with 127,000 sqft of IT space on a 240MW campus.

Key Points

  • Phoenix PH4 will be available in July 2026
  • Offers 36MW of critical IT load and 127,000 sqft of IT space
  • Located on a 240MW campus
  • Supports power densities of 70kW/rack or higher
  • Features multifactor authentication with over 100 real-time security feeds and 24x7 in-house security team

Infrastructure

UPS Redundancy

N+1 distributed redundancy for each 6MW vault

Security

24/7 securitymultifactor authentication100+ real-time security feeds