Colocation Space
68.5K sqft
Overview
CA3 is part of NTT's 52.7 MW Sacramento campus with three facilities totaling 266,000 sq ft and operates on 100% green energy.
Key Points
- •14 MW critical IT load capacity with 68,469 sq ft of whitespace
- •Part of three-facility Sacramento campus (CA1, CA2, CA3) totaling 52.7 MW capacity
- •N+2 cooling redundancy with chilled water and indirect air-side economization
- •Powered by 100% green energy with on-site 69 kV dedicated power
- •Features 24-hour on-site fuel storage for standby generators
Certifications
ISO 27001SOC 1SOC 2PCI DSS
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+2
Spec Sheet (PDF)
Mar 2026