Microsoft AzureUnder Construction
Microsoft Alviso-Milpitas Campus
1657 Alviso-Milpitas Road, San Jose, California
Power
49.5 MW
Colocation Space
397.2K sqft
Overview
Microsoft Alviso campus on 65-acre site. Two DC buildings totaling 397,205 sqft. Construction began Fall 2025.
Key Points
- •65-acre site acquired 2017 for $73M
- •Two single-story buildings, 397,205 sqft total
- •224 backup generators planned
- •Natural gas microgrid
- •Construction began Fall 2025
Spec Sheet (PDF)
Mar 2026