Est. 2010
Power
48 MW
Overview
Stream Denver data center in Westminster, Colorado. Acquired 2010, 29,500 sqft with 1.125MW critical load. Water-cooled chillers with 60% free cooling capability.
Key Points
- •Westminster, Colorado - acquired 2010
- •29,500 sqft single-story, 10,000 sqft raised floor
- •1.125MW critical load, expandable infrastructure
- •Built 2006 by Fortune 500 insurance company
- •Water-cooled centrifugal chillers with plate heat exchangers
- •~60% free cooling using outside air, dual redundant fiber feeds
Certifications
ISO 27001SOC 2
Mar 2026