Power
3.5 MW
Colocation Space
17.0K sqft
Overview
The TierPoint Jacksonville data center has 15-inch reinforced concrete walls with redundancy for all critical power and cooling systems including dual power feeds.
Key Points
- •120,000+ total square feet with 17,000+ square feet of raised floor space
- •Features 15-inch reinforced concrete walls and redundancy for all critical power and cooling systems including dual power feeds
- •Has one 2,000kW and one 1,500kW generator with minimum 48 hours runtime
- •Offers 100% uptime SLA with 2N A-side and B-side power distribution design
- •Provides 24x7x365 electronic and on-site security with biometric systems and CCTV surveillance with minimum 90 days retention
Certifications
SOC 1 Type IISOC 2 Type IISOC 2 + HITRUSTGLBAHIPAAPCI-DSSNIST SP 800-53ISO 27001ITARData Privacy Framework
Spec Sheet (PDF)
Apr 2026
Sources: