Power
278 MW
Overview
Atlanta 1 features its own on-site Georgia Power substations and direct fiber access to a wide variety of carrier alternatives.
Key Points
- •99 acre campus with 278 MW+ critical campus capacity
- •Three dedicated, on-site, expandable Georgia Power substations planned for the campus
- •Four data center buildings: DC1-DC4 at various Jefferson St and Herndon St addresses
- •Redundant campus fiber conduit system allows for express fiber to each building and between future buildings
- •EV charging available on-site
Certifications
ISO 27001SOC 2HITRUSTPCI DSS