Power
278 MW
Overview
A QTS mega data center campus, Atlanta 1 features its own on-site Georgia Power substations and direct fiber access to a wide variety of carrier alternatives.
Key Points
- •DC4 is located at 1103 Herndon St NW, Atlanta, GA 30318
- •Campus has 278 MW+ critical capacity across 99 acres
- •Features three dedicated, on-site, expandable Georgia Power substations planned for the campus
- •Includes redundant campus fiber conduit system for express fiber to each building
- •EV charging available on-site
Certifications
SOC 2ISO 27001PCI DSSHIPAA
Apr 2026