Overview
First data center on NTT's 19-acre Itasca campus acquired via RagingWire in 2018, with plans for over 200 MW total campus capacity.
Key Points
- •Opened in 2021 as the first facility on NTT's 19-acre Itasca campus near Chicago
- •126,000 sq ft of whitespace within a 225,000 sq ft two-story building
- •36 MW critical IT load with up to 22 kW per rack power density
- •Campus planned for over 200 MW total capacity across multiple buildings
- •Eight 1 MW UPS modules providing N+1 redundancy with fan coil wall cooling
Certifications
LEED GoldEPA ENERGY STARSOC 1SOC 2 Type IIISO 27001ISO 50001PCI DSSNIST 800-53 HighHIPAA
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Spec Sheet (PDF)