STACK InfrastructureUnder ConstructionAI-Ready

STACK Elk Grove Village CH02

Elk Grove Village, IL
STACK Infrastructure
Liquid Cooling
Power

48 MW

Overview

STACK CHI02 in Elk Grove Village, 1 mile from CHI01 campus. 36MW two-story facility on 18 acres with closed-loop air and liquid cooling for AI/ML workloads.

Key Points

  • 18-acre site in Elk Grove Village, ~1 mile from CHI01 campus
  • 36MW critical capacity in 263,000 sqft two-story building
  • Powered by local ComEd substation
  • Closed-loop cooling supporting air and liquid cooling for AI/ML workloads
  • $42.1M land acquisition within Fortune Business Campus
  • Strategic location near O'Hare International Airport

Development Details

Land Size

18 acres

Total Investment

$0B

Total Space (Planned)

0.3M sqft

Certifications

ISO 27001SOC 2Uptime Institute