Power
32 MW
Colocation Space
112.0K sqft
Overview
Chicago CH3 Data Center is available for prelease and is scheduled to open in December 2026.
Key Points
- •Offers 32MW of critical IT load and 112,000 sqft of IT space
- •Available for prelease and scheduled to open in December 2026
- •Features multifactor authentication with over 100 real-time security feeds and 24x7 in-house security team
- •Carrier-neutral with three diverse fiber entry points and two carrier-meet-me-rooms
- •Uses fan coil wall-cooling design with hot aisle containment and dedicated chiller plant with closed-loop water cooling system
Infrastructure
UPS Redundancy
N+1 distributed redundancy for each 8MW vault
Security
24/7 securitymultifactor authentication100+ real-time security feeds
Spec Sheet (PDF)
Mar 2026