Switch Grand Rapids 1

Grand Rapids, MI
Switch
Power

100 MW

Colocation Space

750.0K sqft

Overview

First building at Switch's iconic Pyramid Campus. Former Steelcase HQ converted to data center in 2017.

Key Points

  • Original Pyramid building opened 2017
  • 225,000+ sq ft white space Phase 1
  • 100% renewable energy powered
  • Acquired former Steelcase HQ for $22.2M

Certifications

ISO 27001SOC 2Tier IVLEED Platinum
VerifiedSource: Switch