Power
80 MW
Overview
NAL01 campus in New Albany, OH. 60MW critical capacity with 48MW new capacity. Serves 50% of US population. AI/ML optimized.
Key Points
- •Strategic location serving 50% of US population
- •60MW critical capacity at NAL01 campus
- •AI/ML and cloud workload optimized
- •Part of Ohio hyperscaler growth region
Certifications
ISO 27001SOC 2Uptime Institute
Mar 2026
Sources: