DCQ
CologixOperational

Columbus COL2

555 Scherers Court, Columbus, Ohio, Columbus, Ohio
Cologix
Power

30 MW

Colocation Space

44.0K sqft

Overview

99.999% uptime record; 44K SQFT on 9-acre campus; 700-ton cooling capacity; 45+ unique networks in MMR; 16+ fiber entrances; host to 911 infrastructure for Columbus and surrounding counties

Key Points

  • Located at convergence of long-haul and regional carrier fiber networks
  • 16.2 miles from Port Columbus International Airport
  • No floodplain rating; geographic high point of region
  • Up to 64 kW/cabinet available
  • 3 diverse utility entrance feeds
  • 7 days onsite fuel capacity at full load
  • 24/7 onsite security with CCTV (90-day retention)
  • 150-seat emergency workspace
  • Most densely connected interconnect site in region

Certifications

ISO 27001HIPAA AssessmentSOC 1 Type 2SOC 2 Type 2PCI DSS ValidationEnergy Star

Infrastructure

UPS Redundancy

N+1, 2(N+1)

Cooling Redundancy

2N

VerifiedSource: Cologix