Power
25 MW
Colocation Space
60.0K sqft
Overview
Expected to be ready for service in Q3 2026. Future expansion planned adding 95MW. Generator and UPS configurations: MTU + Mitsubishi UPS.
Key Points
- •AI-ready data center
- •High-density, ultra-low latency infrastructure
- •Direct connectivity to 50+ networks
- •Access to Ohio IX internet exchange
- •Direct access to 30+ cloud service providers including AWS Direct Connect and Google Cloud Platform
- •3 diverse fiber routes to regional interconnection site
- •20 miles from Port Columbus International Airport
- •Within 10-hour drive of 47% of U.S. population
- •Air and liquid cooling capabilities
- •Redundant power loop from AEP substation
- •24/7/365 security personnel
- •Sustainability features: low-carbon concrete, closed-loop mechanical system, 2 EV charging stations, LED lighting
Spec Sheet (PDF)
Apr 2026
Sources: