Power
192 MW
Colocation Space
1.5M sqft
Overview
The OH1 campus in New Albany, Ohio spans 70 acres and will house three two-story hyperscale data centers with the first building slated to be operational by December 2025.
Key Points
- •Campus spans 70 acres and will house three two-story hyperscale data centers totaling 192MW across 1.5 million square feet
- •First building is slated to be operational by December 2025, with additional phases rolling out through 2028
- •Each data center will have 64MW of critical IT load
- •Campus will offer N+1 redundancy across power systems and N+2 redundancy across all mechanical systems
- •Each data center is being built to LEED Silver standards
Certifications
LEED Silver
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+2
Mar 2026
Sources: