DCQ

Vantage OH1-C New Albany

New Albany, New Albany, Ohio
Vantage Data Centers
Power

192 MW

Colocation Space

1.5M sqft

Overview

The OH1 campus in New Albany, Ohio spans 70 acres and will house three two-story hyperscale data centers with the first building slated to be operational by December 2025.

Key Points

  • Campus spans 70 acres and will house three two-story hyperscale data centers totaling 192MW (64MW each) across 1.5 million square feet
  • First building is slated to be operational by December 2025, with additional phases rolling out through 2028
  • Power systems will offer N+1 redundancy with power provided by American Electric Power Ohio
  • Cooling system will use closed-loop chilled water with air-side economizers and N+2 redundancy across all mechanical systems
  • Each data center is being built to LEED Silver standards with hyper-efficient cooling using minimal water

Certifications

LEED Silver

Infrastructure

UPS Redundancy

N+1

Cooling Redundancy

N+2

VerifiedSource: Vantage Data Centers
Mar 2026