Colocation Space
26.0K sqft
Overview
Tennessee's only data center to have both Uptime Institute Tier III certification for design and construction as well as LEED-Gold certification.
Key Points
- •52,000+ total square feet, 26,000+ square feet of raised floor space
- •Tennessee's only data center to have both Uptime Institute Tier III certification for design and construction as well as LEED-Gold certification
- •Two redundant 2,250kW Kohler generators with minimum 48 hours runtime
- •2N A-side and B-side power distribution design
- •100% uptime SLA
Certifications
Uptime Institute Tier III certification for design and constructionLEED-Gold certificationSOC 1 Type IISOC 2 Type lISOC 2 + HITRUSTGLBAHIPAAPCI-DSSNIST SP 800-53ISO 27001 certifiedITAR registeredData Privacy Framework registered
Spec Sheet (PDF)
Apr 2026
Sources: