DA6

1950 North Stemmons Freeway, Dallas, Texas
Equinix
Colocation Space

71.6K sqft

Power Density

3.2 kW/rack

Overview

$34M Phase 1 expansion at Dallas Infomart. 5.2MW across 4 phases (1.3MW each). 82,000+ sqft colocation when fully built.

Key Points

  • 5.2MW total (4 phases x 1.3MW each), 82,000+ sqft at full build
  • $34M Phase 1 investment, 450 cabinets initial capacity
  • 4 expansion phases, 900 additional cabinets beyond Phase 1
  • Part of Infomart campus with DA1/2/3, 3,500+ combined cabinets
  • Metro-connected to DA7 (Plano) and Equinix Internet Exchange

Development Details

Total Investment

$0B

Internet Exchanges

Equinix Internet Exchange

Certifications

HECVATHIPAAISO 22301ISO 27001ISO 50001ISO 9001LEEDNIST 800-53/FISMA HighPCI DSSSOC 1 Type IISOC 2 Type II

Infrastructure

UPS Redundancy

N+1

Cooling Redundancy

N+1

Generator Capacity

7.5K kW

Uptime SLA

99.999%+

Renewable Energy

100%

Security

24/7 Security Vendor on siteBiometricsEntrance Mantraps24/7 Surveillance Video RecordingCard readersCCTV surveillance with 90-day retentionMotion detection

Amenities

BreakroomConference RoomCrash CartsLoaner toolsShowersWifiWork Kiosks