Power
60 MW
Colocation Space
200.0K sqft
Overview
DFW12 will be the fourth of eight 2-story data centers with Universal Data Hall Design and HPC-ready capabilities supporting rear door heat exchangers and water-to-chip cooling.
Key Points
- •200,000 raised square feet with 60MW critical IT load capacity
- •N+1 power and cooling design with 100% renewable energy source
- •HPC-ready with support for rear door heat exchangers and water-to-chip cooling
- •Supports high-density cooling up to 45kW+ for air and 100kW+ for liquid
- •Part of Red Oak Campus Phase 1 design featuring Universal Data Hall Design
Development Details
Timeline
First Building:Q2 2026
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Spec Sheet (PDF)
Apr 2026