Power
60 MW
Colocation Space
200.0K sqft
Overview
DFW9 is the first of eight planned 2-story data centers at the Red Oak campus with HPC-ready capabilities supporting water-to-chip cooling.
Key Points
- •200,000 square feet of raised floor data center space
- •60MW critical IT load capacity with N+1 power design
- •N+1 cooling design supporting 45kW+ cabinet density for air cooling and 100kW+ for liquid cooling
- •HPC-ready with ability to support rear door heat exchangers and water-to-chip cooling
- •100% renewable energy source with 120/208V and 240/415V AC power options
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1
Spec Sheet (PDF)
Apr 2026
Sources: