Tier 3Liquid Cooling
Power
84 MW
Colocation Space
603.3K sqft
Power Density
200 kW/rack
Building Size
430.0K sqft
Overview
Round Rock campus with Building A (30MW) complete Oct 2024. Building B (54MW) Q3 2027. TACC Horizon supercomputer tenant.
Key Tenant: Texas Advanced Computing Center (TACC)
Key Points
- •Building A: 430,000 sq ft, 30MW, completed Oct 2024
- •Building B: 54MW under construction, Q3 2027
- •TACC Horizon supercomputer tenant
- •200kW/cabinet liquid cooling support
Certifications
SOC 1 Type 2SOC 2 Type 2ISO 27001SSAE 18HIPAAHITECHPCI DSSEnergy Star
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1