Colocation Space
230.0K sqft
Power Density
20 kW/rack
Overview
First phase of NTT's 42-acre Dallas campus with planned full build-out capacity of 144 MW across multiple facilities.
Key Points
- •16 MW critical IT load facility located in Garland, Texas with 230,000 sq ft total building size
- •First phase of NTT's 42-acre Dallas campus with eventual 144 MW build-out planned across multiple facilities
- •Originally developed by RagingWire (acquired by NTT starting 2014), established in 2016 and operational by 2017
- •Power delivered in 2 MW increments with customizable suites/cages at 1 MW, 2 MW, 3 MW, or 5 MW
- •Carrier-neutral facility with two Meet-Me-Rooms and direct dense fiber network access
Certifications
SOC 1SOC 2 Type IIISO 27001PCI DSSNIST 800-53 HighHIPAA