DCQ
Aligned DataOperational

Aligned Data Centers Salt Lake

3333 West 9000 South, West Jordan, Salt Lake City, UT
Aligned Data
Power

34 MW

Overview

Aligned's Salt Lake City campus. SLC-01 at 34MW, with SLC-02 (48MW), SLC-03 (80MW), SLC-04 (270MW) in development.

Key Points

  • SLC-01: 300,000 sq ft, 34MW
  • SLC-02: 240,000 sq ft, 48-60MW
  • SLC-03: 80MW (Blackstone $600M loan)
  • SLC-04: 270MW planned
  • 55-acre campus
  • Cold desert climate reduces cooling costs

Certifications

SOC 2
VerifiedSource: Aligned Data
Mar 2026