DCQ

QTS Richmond

6000 Technology Blvd, Sandston, VA 23150, Richmond, VA
QTS
Power

238 MW

Colocation Space

2.3M sqft

Overview

Richmond 1 is the largest and most connected data center campus in the area.

Key Points

  • Spans 207 acres making it the largest data center campus in the area
  • 238 MW critical campus capacity across the facility
  • Master planned campus will feature 6 facilities total
  • 2.3 million square feet of total current space
  • Energy efficient LEED Gold Certified with on-site solar panel power system

Certifications

LEED Gold Certified
VerifiedSource: QTS
Apr 2026

Sources: