Tier IIILiquid Cooling
Power
85 MW
Colocation Space
645.0K sqft
Power Density
100 kW/rack
Overview
38-acre Ashburn campus with 85MW at full buildout. Building A (3-story, 54MW) groundbreaking 2025, ready 2026. Supports 100+ kW/rack.
Key Points
- •38-acre campus in Data Center Alley
- •Building A: First 3-story Sabey facility, 54MW
- •Supports air, liquid, or hybrid cooling
- •100+ kW/rack density capability
Certifications
SSAE 18 SOC 1 Type 2SOC 2 Type 2ISO 27001HIPAAHITECHPCI DSSEnergy Star
Infrastructure
UPS Redundancy
N+1
Cooling Redundancy
N+1