Power
54 MW
Overview
Sabey's 38-acre Ashburn campus with 36MW operational and Building A adding 54MW in 2026. Air/liquid cooled hybrid options.
Key Points
- •85MW total campus capacity at full buildout
- •36MW operational across two buildings
- •Building A: 54MW coming online 2026
- •Air-cooled, liquid-cooled, or hybrid options
- •PUE 1.35, carrier-neutral
- •5+ Tier 1 network providers
Development Details
Land Size
38 acres
Certifications
ISO 27001SOC 2Uptime Institute
Mar 2026